Estimating & preconstruction · Albany, NY
Bid with 518 GC Exteriors
Practical exterior envelope pricing for general contractors, construction managers, developers and owners bidding work within two hours of Albany.
Updated November 2026
What to include in your invitation to bid
Complete bid sets let us return tight numbers without padded contingencies. When you add 518 GC Exteriors to an invitation, send:
- Drawings: Architectural floor plans, exterior elevations, building sections, enlarged wall and window details, plus structural framing sheets where canopies, parapets or prefabricated EIFS panels tie in.
- Specifications and addenda: Relevant Division 07 and Division 09 sections (air barriers, EIFS, metal wall panels, stucco, joint sealants, exterior coatings) along with every issued addendum.
- Schedule and bid date: Bid due date and time, target shell dry-in month, and substantial completion milestone so we can evaluate cold-weather windows—wet EIFS, stucco and barrier work requires about 40 °F and rising with 24 hours above freezing.
What a typical proposal includes and excludes
Estimators need scope letters that line up cleanly on a leveling sheet. Our proposals break out individual trades or multi-trade bundle pricing and state explicitly what is in and out:
- Typically included: Specified fluid-applied air and water barriers and rough-opening transition flashings; commercial drainage EIFS insulation, mesh, base coat, starter tracks and finish; ACM and aluminum plate panels with panel sub-framing; stucco; cladding-to-cladding and perimeter waterproofing sealants; submittals, standard samples and cleanup of our trade debris to an on-site container.
- Access clearly stated: We own supported pipe and frame scaffolding set by our own crew, and we also work from rented or GC-furnished boom and scissor lifts. Every proposal specifies which access method is carried in our base number.
- Typically excluded unless requested: Structural steel, cold-formed structural stud framing, wood blocking, exterior gypsum sheathing (except inside unitized prefab panels), dumpsters, temporary water and power, snow removal, and winter tenting or temporary heating.
How we read specs, flag conflicts and handle submittals
We read wall sections line by line during takeoff. When drawings omit roof-to-wall kick-out flashings, place foam below grade, specify an EIFS adhesive over an incompatible silicone air barrier, or skip floor-line expansion joints on wood-framed buildings, we note the condition clearly so your team can issue a pre-bid RFI or carry the right detail from day one.
Once under contract, we assemble organized submittal packages—product data sheets, manufacturer details, compatibility letters, color charts, textured EIFS drawdowns and shop drawings for panelized work—so architect reviews do not hold up procurement.
Site access, mockups and closeout documentation
Before full production starts, we build required standalone or in-place first-bay mockups and coordinate rough-opening sequencing with window and roofing subcontractors. Our own insured crews perform the field work; The Dom Construction Group LLC carries general liability, umbrella and workers' compensation insurance (certificates on request) and is registered on the New York State public work contractor registry. At substantial completion, we walk elevations with your superintendent prior to striking scaffold and turn over closeout documentation promptly.
How a bid package moves through our desk
A straightforward estimating workflow built for commercial bid calendars.
Send plans, specs and bid date
Share a plan-room link or drawing folder with architectural elevations, wall sections, Division 07 and 09 specs, addenda and your due date.
Detail review and scope clarifications
We check substrate transitions, flashing details, movement joints and seasonal cure timing, flagging any spec conflicts early enough for pre-bid RFIs.
Itemized proposal before bid day
You receive a written scope letter breaking out base assemblies, requested alternates, scaffold or lift assumptions and clear inclusions and exclusions.
Buyout walk and submittal launch
During scope leveling we review schedule milestones, insurance certificate requirements and long-lead panel or color approvals so submittals start promptly.
Bidding and preconstruction questions
What files help your estimating desk turn around an accurate facade proposal?
Architectural floor plans, exterior elevations, building sections, enlarged wall details, structural framing sheets at canopies or panel bands, Division 07 and Division 09 specification sections, issued addenda and the target construction schedule give us everything needed for a clean takeoff. Knowing when the shell dries in also lets us flag cold-weather curing windows or panelization alternates up front.
Are exterior sheathing and structural stud framing included in your proposals?
Unless a general contractor specifically asks us to price sheathing on a targeted re-clad or unitized prefab panel frame, cold-formed structural stud framing, wood blocking and exterior gypsum sheathing are excluded and carried by the carpentry or drywall framing subcontractor. Every proposal lists exact inclusions and exclusions line by line so estimators never double-count or miss a layer.
How is scaffolding or lift access handled in your subcontract bids?
Because The Dom Construction Group LLC owns supported pipe and frame scaffold erected by our own crew, we state clearly in our scope letter whether our base price includes our scaffold, rented boom or scissor lifts, or shared site lifts furnished by the general contractor. If multiple trades need facade access, we can also price scaffold rental separately.
Do you provide product data submittals, color samples and field mockups?
Yes. After subcontract award, we prepare complete Division 07 and Division 09 submittal packages covering manufacturer data sheets, system details, sealant compatibility, color charts and physical textured EIFS drawdowns or metal chips. When specifications require an on-site mockup wall or in-place first-bay approval, our crew builds the sample assembly so architects can review transitions before full production.
What happens if the architectural details show a moisture trap or spec conflict?
We read wall sections closely during estimating rather than pricing blind. If drawings omit kick-out flashing, run EIFS below grade, pair incompatible membranes and adhesives, or lack movement joints at floor lines, we note our clarification right on the scope letter so the estimating team can submit a pre-bid RFI or price the corrective detail cleanly.
Send a bid invite or project details
Paste a link to your plan room or folder, note the bid due date, and list the scopes you want priced.
Trade packages you can combine
- Commercial EIFS
Drainage EIFS, re-clads and architectural feature finishes.
- Prefabricated EIFS panels
Unitized EIFS panels and bands set from lifts or cranes.
- Air & water barriers
Fluid-applied membranes, seam prep and rough-opening flashings.
- Aluminum panels
ACM and plate panels, sign bands, column covers and soffits.
- Scaffolding
Company-owned pipe and frame scaffold erected by our own crew.
Have a bid date coming up? Reach our estimating desk.
Book spring work now. Winter assessments and estimates available.