518 GCEXTERIOR ENVELOPE FOR GENERAL CONTRACTORS (home) Call or text (518) 888-7938 Free estimate

Albany · Schenectady · Troy · Saratoga Springs

Exterior envelope subcontracting across the Capital Region

Your exterior envelope sub, from bid to closeout. We install commercial drainage EIFS, prefabricated EIFS panels, fluid-applied air and water barriers, aluminum panels, stucco, waterproofing and scaffold within two hours of Albany.

Call or text (518) 888-7938

Book spring work now. Winter assessments and estimates available.

Photo: AI-generated video; still image is a stock photoAI-generated video: drone orbits a new commercial building with EIFS and metal panels under construction

  • Our own crewsThe Dom Construction Group LLC self-performs the work with about 19 years of field team experience.
  • Own pipe scaffoldCompany-owned supported pipe and frame scaffold set by our crew, plus boom or scissor lifts as needed.
  • Insured & registeredGeneral liability, umbrella and workers' comp certificates on request; NYS public work contractor registry.
  • Clear scope lettersItemized bids from your drawings, specs and addenda, with replies within one business day.

Exterior envelope scopes we subcontract

Eight exterior trades you can buy individually or bundle into one coordinated facade package.

Modern commercial building facade

Commercial EIFS

Drainage EIFS, re-clads and repairs on commercial and multifamily jobs.

AI-generated illustration: cutaway of a drainage EIFS wall, from studs and sheathing out to the textured finish

AI-generated illustration

Air & water barriers

Fluid-applied barriers and flashing behind the cladding.

AI-generated illustration: reinforcing mesh troweled into wet base coat, with a diagonal mesh patch at a window corner

AI-generated illustration

Stucco

Cement stucco repair, refinishing and new three-coat stucco.

AI-generated illustration: a sealant bead tooled over backer rod where an EIFS wall meets a window frame

AI-generated illustration

Waterproofing

Sealant joints, flashing, air and water barriers and breathable coatings.

Scaffold along a multistory building

Scaffolding

Company-owned pipe and frame scaffold for our jobs, owners and other trades.

Where exterior packages lose time between trades

Four coordination breakdowns general contractors run into when the outer wall is split across separate subs.

Leaking window and storefront perimeters

Water shows up at interior sill tracks or drywall jambs during rainstorms or hose tests.

Usually means
The air-barrier sub stopped short of the rough opening, glazing went in dry, and the cladding crew merely caulked the outer face.
What we do
Wrap rough openings with compatible transition membrane tied into sill pans before frames go in, then back-wrap cladding and install proper backer rod and sealant.

Open membrane left unclad into November

Exterior framing is ready late in fall, leaving wet-applied EIFS finish vulnerable to overnight freezes.

Usually means
Upstream steel, framing or window delays pushed facade mobilization past the 40 °F-and-rising curing window.
What we do
Flag seasonal cutoffs during buyout and switch critical sign bands or elevations to prefabricated EIFS panels or planned heated scaffold enclosures.

Misaligned metal panel and EIFS planes

ACM sign bands, drip flashings and adjacent EIFS wall fields miss their intended reveal depths at corners.

Usually means
Two separate wall subs detailed continuous insulation and sub-girt thicknesses independently without coordinating shared transitions.
What we do
Coordinate sub-framing depths, continuous barrier laps and receiver flashings in one combined shop-drawing and mockup submittal.

Roof-to-wall and parapet runoff stains

Dark streaks, soft sheathing or blistered finish appear below sloped roof terminations and parapet ends.

Usually means
Kick-out diverter flashings were omitted between roof and wall scopes, or coping caps barely cleared the underlying sheathing.
What we do
Install corrosion-resistant kick-out flashings integrated behind the weather barrier and verify coping projection past the finished foam thickness.

From bid set to final punch

How our estimating desk and field crews run a commercial exterior subcontract.

  1. Clear takeoff and scope letter

    Send architectural drawings, Division 07 and 09 specs, addenda and milestone dates. You get an itemized proposal spelling out assemblies, access assumptions and exclusions.

  2. Submittals, samples and mockups

    We turn around product data, system details, sealant compatibility checks, physical finish samples and on-site mockups before field mobilization.

  3. Sequenced installation by our own crew

    Our insured crew installs barriers, flashings, EIFS, panels and sealants from our own pipe scaffold or lifts, coordinating rough openings with window and roofing trades.

  4. Clean punch list and closeout

    We walk elevations with your superintendent before scaffold comes down, complete touch-ups cleanly and deliver closeout documentation on time.

Why general contractors bundle the outer wall under one sub

On commercial and multifamily projects, most facade leaks and schedule stalls happen in the handoffs: one subcontractor applies the weather membrane, a second installs foam and finish, a third sets metal sign bands, and nobody owns the transition flashing or perimeter joint sealant. When a rough opening leaks during punch list, three trades point at each other.

518 GC Exteriors is the exterior envelope subcontracting service of The Dom Construction Group LLC for general contractors, construction managers and owners bidding work in the Capital Region. Call or text (518) 888-7938. We put fluid-applied air and water barriers, commercial drainage EIFS, prefabricated EIFS panels, ACM and plate panels, stucco, waterproofing and company-owned pipe scaffold under one written scope. We do not act as a general contractor building whole buildings; our job is closing in and finishing the exterior shell cleanly so interior trades stay dry and on schedule.

Our field team brings about 19 years of hands-on experience in EIFS, stucco, masonry and exterior coatings. Our own insured crews perform the installation, erect our own frame and pipe scaffold where ground bearing allows, and work from boom or scissor lifts where mobile access makes more sense.

Recent Capital Region commercial and public work

Our recent local scopes range from public campus facilities to tight urban streetscapes and retail pads:

  • University at Albany, Casey Stadium (2026): Refinished the EIFS canopy under a public contract.
  • State Street, Schenectady (2026): Fabricated and set a band of prefabricated EIFS panels from a boom lift over a busy downtown sidewalk.
  • Clifton Park Shake Shack (2026): Applied the EIFS feature panel finish on a new commercial storefront.
  • Catskills residence (fall 2025): Installed a complete new drainage EIFS envelope over a steel-framed structure.

For estimators on a deadline, send architectural elevations, wall sections, Division 07 and 09 specifications and any addenda. We return a clear scope letter breaking out base bid assemblies, alternates, access assumptions and cold-weather curing constraints. Whether you are pricing a full facade package or solving an existing wall leak with a paid exterior inspection, see how to bid with us or read about our crews and Albany office.

AI-generated illustration: cutaway of a drainage EIFS wall, from studs and sheathing out to the textured finish

AI-generated illustration

AI-generated illustration

Send drawings or project photos for pricing

Paste a plan-room link in the message box, or attach up to five wall photos for repair pricing.

Rather text? Text photos to (518) 888-7938

What are you seeing? (optional)
Add details (optional)
Property (optional)
How soon? (optional)
Best way to reply (optional)
Photos (optional, up to 5)

Add 3–5 photos: one close-up and one of the whole wall. We shrink them before sending.

    required. We reply within one business day, Monday to Friday. We use your details only to reply to this request. Privacy

    Rather text?

    (518) 888-7938

    Call or text Monday–Friday, 7 AM–5 PM.

    Questions estimators and project managers ask

    Do you bid as a prime general contractor or strictly as an exterior subcontractor?

    518 GC Exteriors bids strictly as a specialty exterior envelope subcontractor to general contractors, construction managers, developers and building owners. We do not build foundations, structural framing, mechanical systems or interior fit-outs. Keeping our scope focused on air and water barriers, EIFS, prefabricated panels, aluminum panels, stucco, waterproofing and scaffold lets our crews stay aligned with your project schedule instead of competing with general contractors.

    Can you combine the air barrier, EIFS and metal panels into one subcontract?

    Yes. Bundling fluid-applied air and water barriers, rough-opening transition flashings, commercial drainage EIFS, prefabricated EIFS bands, aluminum composite panels and perimeter joint sealants under one subcontract is how many general contractors prefer to buy the facade. One crew handles substrate prep through final finish, which eliminates trade gaps at window perimeters, parapets and cladding transitions and simplifies submittal coordination.

    Who performs the field installation on your projects?

    Our own crews from The Dom Construction Group LLC perform the exterior envelope work rather than brokering packages out to unvetted labor tiers. Our field team has about 19 years of experience across EIFS, cement stucco, masonry and exterior coatings. We also own supported pipe and frame scaffold that our own crew erects and dismantles when ground conditions suit fixed staging.

    Are you insured and registered for New York public work?

    Yes. The Dom Construction Group LLC carries commercial general liability, umbrella and workers' compensation insurance, and our office issues insurance certificates upon request during buyout. We are registered on the New York State public work contractor registry and have completed public campus work, including the 2026 EIFS canopy refinish at Casey Stadium at the University at Albany.

    What temperatures do your exterior wall systems require?

    Wet-applied exterior materials—including EIFS adhesives, polymer-modified base coats, acrylic textured finishes, cement stucco and most fluid-applied air and water barriers—require ambient and substrate temperatures of about 40 °F and rising, with no freezing for at least 24 hours. In upstate New York, open-air finish seasons run from spring into late fall unless heated enclosures or prefabricated panels are planned.

    Cities and towns we cover from Albany

    • Albany
    • Schenectady
    • Troy
    • Saratoga Springs
    • Clifton Park
    • Glens Falls
    • Amsterdam
    • Hudson
    • Kingston
    • Oneonta

    Work within about two hours of Albany, including the Catskills, Hudson Valley and Lake George

    Put 518 GC Exteriors on your bid list

    Book spring work now. Winter assessments and estimates available.